Since most of the time retrofit applications are done from the outside of a home, usually there is nothing a customer needs to do to prepare for us.
However we do ask that wall mounted mirrors and pictures be removed off the wall the date of the installation and precious objects be removed off exterior wall shelving
Upon arrival our technicians will introduce themselves and go over their plan of action with you to ensure customer satisfaction.
1. We will inspect the job, and assess where we need to drill the holes
2. We will drill small access holes roughly the size of a dime, usually 2 holes per stud cavity.
3. We blow the insulation in from the exterior of your home, any of our equipment typically remains outside.
4. Access holes are located at the bottom and top of each stud cavity to ensure we can properly fill the entire cavity.
5. Once the installation is completed the crew members will clean up any messes or debris
6. Upon completion the customer is asked to initial a customer satisfaction sheet ensuring all jobs were completed to satisfaction standards.